Task:
The papermill had to meet the requirements for BOD/COD removal and they choose Mutag to assist with that.
Solution:
Mutag delivered plant design and engineering service; MBBR for COD/BOD removal. We delivered Mutag BioChipTM and technical equipment for the biological treatment tanks.
Results:
The plant has been in operation since 2010 and the Mutag BioChipTM are still fully efficient cleaning the wastewater.
The BioChipTM are used for high-loaded COD/BOD removal with a volume flow rate of Q = 23,520 m3/d.